top of page
PROJECTS
Trelleborg Offshore Rubber Curing
Heating Trelleborgs Rubber based Subsea Thermal Insulation 3 layer coating system to bond with spool.
Valmec Services Shrink Fit
Removal of Old Hub and Oil Slinger Ring off a Crank Shaft & Install new Hub on new Gas Compressor
Rio Tino - Bucyrus Rotating Drill 62
Hail Creek A-Frame Pivot Shaft Upgrade
BMA Saraji Dragline Shutdown
Pre-Heating for Swing 3 Housing & Drum Cradle Crack Repairs and a new Boom-point Trunnion Installation
BMA Hydrolic Digger Crack Repair
Peak Downs Digger Shutdown for Crack repairs
EliMetal Vessel Pre-Heat
Pre-Heat Vessel to 250C using Clamp shell. Pipe size 2300OD with 180mm thickness.
BMA Goonyella Shovel Shutdown
Pre-Heating for Internal Revolving Frame Cracks
Komatsu Fleet Warranty Repairs
Pre-Heat & PWHT on Truck Chassis
ThyssenKrupp Stacker Reclaimer Links
Pre-Heating for Fabrication of 4 Stacker Reclaimer Links
bottom of page